How long does it take to install a platform lift?

It is possible to install a platform lift with 2 stops and a rated load of 300-500 kg in as little as 2-3 days. Our bigger platform lifts with a rated load of 1000 kg, and our cabin lifts can be installed within 3-5 days (2-stop lift).

If the lift needs to serve more than 2 floors, the installation time will increase. The higher the lift, the longer it will take to build it, but it never takes a long time to install a platform lift.

Why platform lifts are easy to install #

All of our lifts are machine room less and need very little building adaptation, because they have a low pit and require minimal headroom. Most of our lift models also come with a ready-made lift shaft so you do not need to build one unless you want to. If you would like to learn more about our easy installation process, you can read more here.

Installation time of other lifts #

Conventional traction or hydraulic lifts often take several weeks, sometimes even months, to install. This is because you need to build a masonry shaft to fit the lift and also make more adjustments to your building, given that conventional lifts generally need a deep pit and a lot of space above the lift to fit the top machinery. Many hydraulic lifts also need to fit a big hydraulic tank next to the lift. Learn more about the installation time of other lifts here.